How it worksProjectsRenderingsServicesContact 561-544-7444 Discuss Your Project Our Companies
Storm Shield crew installing roof underlayment

Roofing

A South Florida roof takes sun, salt air and hurricane season every single year. We replace and repair tile, shingle and flat roofs to current Florida code — and we tell you honestly when a repair will do instead of a full replacement.

What we handle

  • Full roof replacement — concrete and clay tile, architectural shingle, metal and flat/modified bitumen systems.
  • Leak diagnosis and repair — finding the actual entry point rather than sealing the stain on the ceiling.
  • Storm and wind damage — documented inspections and repairs after named storms.
  • Re-roof for insurance — roofs specified and documented to satisfy carriers and wind-mitigation credits.
  • Underlayment, flashing and tile re-set — the details that actually decide how long a roof lasts.

Why homeowners call us first

We are a licensed roofing contractor (CCC1327510) and a licensed building contractor (CBC1254591). That matters the moment a roof job turns into rotted decking, a structural repair or a skylight rebuild — there is no second contractor to hire and no argument about who owns the problem.

Signs it is time to look at your roof

  • Tiles slipping, cracked or missing after a storm
  • Staining on ceilings or in the attic after heavy rain
  • Granule loss and curling on a shingle roof
  • A roof past 15 years that has never been inspected
  • An insurance carrier asking for a roof condition report

Our work

Recent projects

Roof underlayment installation
Underlayment
Structural framing
Framing
Block and tie-beam work
Structure

Questions

What homeowners ask us

Often a repair is enough, and we will say so. What decides it is the age of the system, the condition of the underlayment, and whether the leak is one failure or the beginning of several. We show you what we found before we quote anything.

It frequently does. Florida carriers apply wind-mitigation credits for roof age, deck attachment and secondary water barrier. We document the work so your inspector can certify it.

Most single-family re-roofs run one to two weeks on site, weather permitting. Tile takes longer than shingle. We give you the schedule before we start, not after.

Tell us what you have in mind

We’ll look at the property, talk through the options and put a real number on it. No obligation.

Discuss Your Project